Estimating Home Building Costs
Table of Contents
Introduction |
Preview A Chapter |
Back Cover
1
The Building Site, 5
Buying the Site, 9
Recording and Legal Fees, 10
Engineering Fees, 11
2 Preliminary Costs, 15
Plot Plans, 16
Building Permits, 18
Water, Sewer, Electric, 22
3 Site Clearing, Excavation and Fill Dirt,
25
Site Clearing, 26
Excavation, 27
Fill Dirt, 30
Site Cleaning and Hauling, 33
4 Footings, 35
Layout, 36
Estimating Concrete Quantity, 36
Estimating Other Material, 41
Estimating Labor Costs, 45
5 Foundations, 53
Estimating Masonry Blocks, 55
Estimating Mortar and Sand, 63
Basement Windows, Foundation Vents and
Basement Doors, 65
Lintels, Beams, Column Posts, Anchor Bolts and
Reinforcing Steel, 67
Waterproofing and Drain Tile, 71
Miscellaneous Materials 74
Masonry Labor, 75
Other Labor, 76
6 Floor Systems, 79
Sill Plate, Girder, Ledger or Joist Hangers, 82
Subfloor, 93
Labor Costsfor Floor Systems, 100
7 Superstructure, 105
Exterior and Interior Walls, 105
Ceiling and Roof Framing, 126
Porch Shed Roof Framing, 155
Stair Stringers, 158
Labor Costs for Superstructure, 164
8 Roofing, 170
Roof Covering, 171
Nails, 180
Labor Costs for Roofing, 181
9 Electrical, Plumbing, Heating and Air
Conditioning, 183
Electrical, 183
Plumbing, 185
Heating and Air Conditioning, 187
10 Estimating Brickwork, 189
Fireplaces and Chimneys, 195
Labor Costs for Brickwork, 201
11 Energy Saving Materials, 205 Insulation,
206
Estimating Materials, 213
12 Interior Wall and Ceiling Finish, 219
13 Exterior Trim, 227
Windows, Exterior Doors, Siding, 228
Fascia, Frieze and Rake Boards, 230
Porch Column Posts, Gable Louvers, Garage Doors, 232
Shutters and Flashing, 233
14 Concrete Floors, Walks and Terraces, 243
Crushed Stone, 244
Welded Wire Fabric, Reinforcing Rods, 246
Tie Wire, VaporBarrier, FormsandScreeds, 247
Additives for Concrete, 248
15 Interior Trim, 259
Flooring and Floor Underlayment, 260
Interior Doors and Window Trim, 262
Baseboard, Baseshoe, and Wall Molding, 263
Paneling, 267
Kitchen Cabinets, Vanities, and Closet Shelves, 270
Stairs, 271
Mirrors and Medicine Cabinets, 273
Tub and Shower Doors, Bathroom Accessories, 274
16 Painting, Floor Covering and Appliances,
281
17 Gutters, Onsite Improvements and
Miscellaneous, 287
18 Overhead, Contingency and Profit, 291
Glossary, 295
Introduction |
Preview A Chapter |
Back Cover
Estimating Home
Building Costs
CR265
Not Available At This Time
|
|
|