www.Contractor-Books.comFriday, July 25, 2008
One Stop Shopping for Construction Books, Code Books, Contractor Tools & Equipment
Means Mechanical Cost Data 2007
Book
We've got the answers to your questions about
HVAC/controls costs.
Thousands
of Quick-Quote Unit Costs. All with RS Means Nine-Point Data
Breakdown.
Easy to customize. Easy to use.
Definitive data on unit costs for materials,
methods, equipment and other building services. This cost data is
referenced by professionals Nationwide from contractors and
engineers to architects and facility managers.
Plus for every line item, you get the crew and productivity
information you need, as well as bare costs for material, labor and
equipment, and cost with overhead and profit.
Includes hundreds of unit
costs for:
Basic materials and methods
Building services and process piping
Plumbing fixtures and equipment
Refrigeration equipment
Heating, ventilation and A/C equipment
HVAC instrumentation and controls
Testing/Adjusting/Balancing
Over 200 lines of selective demolition
flexible cable pipe and duct
hanger / support
spiral pipe supply registers
for several duct diameters
54 Common Assemblies
with Easy Plug-In Pricing for Hundreds of Variations.
Saves time in the early stages. Simplifies
fine-tuning as plans progress. Whether you want to compare costs of
single- and double-wall tanks in the same configuration, put a quick
price on an installed system, or need a schematic for clarification,
you’ll find it here.
Assemblies include a range of options in:
Energy supply
Heat generating systems
Cooling generating systems
Distribution systems
Terminal and package units
Controls and instrumentation
Dust/Fume collectors
Building sitework
Basement wall construction
Back-Of-The-Book
Reference Section.
Answers questions. Saves
time. Helps you avoid costly oversights and errors.
RSMeans invaluable reference section provides
the information you need to make the most of this incomparable
pricing annual. Includes background data on specific unit cost
lines… tips on component selection… estimating guidelines… as well
as:
Square and cubic foot costs for 59 typical
structures – with percentage breakout for HVAC and plumbing.
Current crew and equipment costs for 23
mechanical crews – and hundreds of others.
On-Site adjustment factors for 930+ cities
and towns in the U.S. and Canada.
Historical adjustment factors for the past
50 years.
Step-by-step instructions to make it very
easy to use RSMeans data.
And:
FREE Means Estimating Hotline: Personalized
help in using Means data effectively in your estimating.
FREE email subscription to The Change
Notice on-line quarterly newsletter-a comprehensive report on
market indicators, construction price trends, regulations, and
industry news.
This is the choice of
professionals nationwide: contractors, estimators,
subcontractors, engineers, architects, owners, designers, facilities
managers, building inspectors, lenders, insurers, and all branches
of the military.
How
to Estimate with Means Data & CostWorks
Learn and Practice Estimating Techniques with the Construction
Cost Data Used Most by Industry Professionals -
This step-by-step guide takes you through all the major
construction items - now with expanded coverage of site work, concrete and
masonry, wood and metal framing, doors and windows, finish work and
roofing. - includes a fully
functional instructional version of Means CostWorks
CD-ROM
Order online: Add your item to your shopping cart and
submit your order online*. Order
offline: Add your item to your shopping cart and print an
offline order form*. Mail or fax your order to us